Update on the gas bill pool. I've canceled the contest since I had the dates wrong for the billing cycle and didn't want to be accused of any impropriety, (Pop,) and also, I had virtually no takers! The gas bill for January 11 to February 9 (29 days,) was $641.22.
We are still crawling at a snails pace on the other open projects. Dan gave up on doing the walls ourselves, so we had Rob get his drywaller over to tape and mud the cracks. Daylight (yup, that's the name embroidered on his shirt,) did a very nice job taping up and patching where the new window frame went in as well as going over the tape job I did on the cracks and filling in some other bad areas. We will be ready to paint this weekend and will stain the floor next week with an eye on having the bath complete by the week of March 5.
Rob and Co. came by this week to build a temp wall and set a steel beam over top to hold the flexicore panels which are supposed to be installed tomorrow, (I'll believe it when I see it,) and finish off filling in and drilling through the old window openings to hold the angle iron against the kitchen wall to which the ends of the flexicore will be welded/bolted. And they shoveled out the ice and snow so they would have a nice work surface, instead of an ice work surface.
We discussed door options and Rob and Co. will be building a set of walk thru doors for the old garage where we are taking out the lift door and building a solid wall. We'll also remove the original sliding carriage house door (now fixed in place), build a wall and put a high transom window on the other side. That should go a long way in improving the temperature in the garage and kitchen/office/art room on top.
We are not looking forward to having the opening cut between the old and new garage. Concrete cutting produces a dust so fine that it's like smoke and seeps in everywhere. We know that even with measures in place, we won't be able to stop the dust from seeping in all over the house and then settling everywhere. That will happen in about a month once the inside of the garage is trimmed out and the lift door hung.
The cat finally caught a mouse (with proof) this week. The mouse was getting pretty bold considering Tommie's been on board for a couple of months. He must have lulled him into a false sense of security. I was up in the middle of the night on Tuesday and was presented with the rodent. It was fresh! Thanks, Tommie. The cat has also figured out another way into the walls/floor as he turned up filthy again this morning, with all the usual holes still blocked. If only we could train him to administer a shot of that foam sealant wherever he's finding these holes.
We have a meeting with the landscape architect on Saturday. We are going to take a look at the side lot as well, working towards a master plan for re-foresting it. (Dan wants to plant a labyrinth, complete with reflecting pool/gazing ball in the middle - I guess this goes along with his grand plan for the conservatory over top the limestone patio outside the dining room.) We hear that Seibenthalers (the go-to nursery/landscape co. in these parts,) has a kick-butt tree sale in the fall and the more you buy, the more they discount. We'll be waiting for that one.
I'll be ready with the camera tomorrow should the crane and panels show up.