The garage door arrived today to be sent off for painting. There is nothing to attach it to in the new garage yet so I guess it's just as well. I am eager to get it installed to secure the space now that we have the cut out done between the old and the new. Rob met with the concrete guy to pin him down on when we will begin to move forward on the top and back fill. I also got him to move the 'bridge' (plank that stretched form the front porch to the top of the garage, over the eight foot drop,) that was such an attractive nuisance to Naomi. (Pic is of said bridge, not garage door.) 
We are quite happy with the sump pump and drain system we've been working on. The drain in the laundry room appears to be working pretty well. It's wet, but at least it doesn't run all the way around the room to the old drain anymore. The new drain keeps the stream out of the way against the cracked wall where it enters. Tommie likes it,
as he'd rather drink from the floor (or toilet) than his bowl. And the sump kicks butt. A couple of weeks ago, as Rob sheepishly fixed the downspout pointing into the hole in the side of the house, he was perched on a ladder in front of the discharge. It throws about 2 gallons in a second or two of 55 degree ground water. It nailed him good! Remember Dan's irrational desire to build a conservatory over the patio linking the living room and dining room? (His rationale: it would give us water-proofing around 17 windows, take care of the leakage down the outside basement walls in that area, give us a nice buffer to the rooms without sacrificing light and - this is new - act as a corridor to the new guest cottage for when the girls are in college and we are running a bed and breakfast. (Don't get me started... ) Well if we had more money than God, I suppose this would work. Rob found the link. I often accuse that whenever he's on the job site, the bill goes up by $4,000 (something always pops up, like another leak or some additional work,) but this time it's more like $104,000!
The floor guys put the last coat on the girls' bathroom floor. This now makes the room fully functioning, and tomorrow the girls will take their inaugural dip. (Tonight's date night.) We still have some issues up there - the window, the medicine cabinet/mirror, and the challenge of fitting a shower curtain to the oddly shaped opening. Rob and I think we have that one licked, although you never know until a theory is tested in practice. He needs to do some cutting and gluing, and I need to do some cutting and sewing.
The hole between the old garage and new garage looks good, although it's few inches shorter than we'd like because we were getting a little too close to the old window which was filled in with concrete. The wall is very thick. You can see the slab that they push out of there... it's about 10 inches. We need a little caterpiller to lift it out of the garage.I hope to have pictures of the roofers, or the concrete guys soon. No luck today.