While we were on Vacation, Bob got most of the doors finished. The pictures are (left to right, top to bottom,) The screen door for the back hall, the double doors from the old garage to the driveway, the walk through from the new garage to the old garage, the back hall door, the dining room patio doors, and the front screen doors.

I met with a geotech/soils engineer this week and we will be having some testing done to try to pin-point where the water seeping into the basement is coming from. (And more importantly, whether it can be mitigated through some manipulation of the land - swales, drains, etc.) This is really the first step towards addressing the rest of the landscaping. We want to get rid of the bunkers, and while doing so improving the water profile of the property. No question adding plants and trees back will help, but if we can do more, now is the time to incorporate earth movement into the plans.

The work that Durable Slate did before we left, particularly the flashing and copper work around the main chimney, failed to hold water while we were on vacation. We came home to water damage in the attic bedroom, Master bedroom and even some in the living room. That is to say that the leaking, worse than we'd ever experienced, went down through three floors. They sent a guy out as soon as I reported the problem but he was unable to do anything about it because it was raining... (Duh.) A crew will be out today to either finish the work up there, (I was under the impression it had been finished as we'd been charged in full for it,) or to dry it in properly.

We now have a way up to the new patio as Dave has finished the steps from the front porch. I'm eager to get the rest of it completed, which is minimal. (Soldering the seams in the copper counter-flashing, general clean-up including power washing the adjacent brick, and re-pointing said brick, trimming out the electrical and maybe restoring the powder room window.)

I've bugged the new landscaper about getting me a plan this week, which he has promised, but I don't really think it's going to happen. The property is still a mess, the weeds exploding while we were on vacation, and the grass growing tall in spite of my request for mowing.

The pool seems to be holding it's own... although with the prodigious rain it's within an inch of overflowing... (into the laundry room.) Like I keep saying, this house has some seriously bad water mojo.

Rob and Co. are working on Dan's Manspace, (the old garage.) They are building a plywood floor over top of the concrete. There is a 6 inch difference from the bottom of the steps to the house over to where the floor drain was. (The one we capped which went directly into the storm sewer.) This will now be flat, although it will still have some slope to it.




And what's up with THIS place????

Tuesday, June 5, 2007

This cOld House 31

It has been almost a whole month since my last blog and we are moving right along on a number of projects.

Since last month, Bob has been working diligently on several wood projects, the biggest being the posts out back. We removed and refurbished the windows in the girls' room and they look/work great! We have been really pleased with the restoration work Dick at Dayton Art Glass did. Aside from his very competitive price, we get the sense that he enjoys this type of work and puts a lot of care and skill into it. One of the windows needed a complete re-build, but they were able to salvage the glass and match the lead almost perfectly. The good news is, yes, we found the yellow jacket nest. It was located inside the post Bob removed. The post was so rotten that it was almost hollow. Here's an example of what shape the wood was in that Bob removed.That's some fine looking hardwood there! We were unable to find a piece of oak big enough replace the posts, so Bob improvised with two 4 x 8 cedar posts, and then he trimmed on the inside, where needed, with oak to match the original design.

We also had the main gas line replaced, and the new meter mounted on the front of the new garage. It's better than in the basement, but ugly as sin and we're planting some boxwoods around it as soon as possible. All the interior gas lines were replaced at the same time, so now we can actually pass the HVAC inspection. The bad news, (of course) is that none of the fireplace lines held test so they had to completely disconnect them to pass the gas inspection and we now have no gas to the fireplaces. We'll address that at a later date, once we get an assessment of the chimneys.

The other big project this month has been the 'Great Wall' which has taken about all month. The other day the mailman asked the wall guys if they wanted him to forward their mail to here. I told them another week and I'd start charging rent. They are doing beautiful work and we are very pleased with how it looks. Initially we wanted a rock wall, to replace the one that the backhoe split apart, but it was infeasible, (read that - way too expensive in this day and age!) so we settled for a landscape block and were relieved to discover our misgivings about the institutional look of the block were pretty well dashed. They had to haul off about half a dozen trucks of fill and we ended up with two full tiers. It's been slow going, and we've had some set backs, not the least of which was Mike digging up the brand new gas line, not once, but TWICE! I noticed when I did the pictures for this post that Mike was wearing the same shirt both times he hit the line (a week apart) so I told him to get rid of the unlucky t-shirt and bury it when they backfilled the second repair. Thank goodness he doesn't have far to go to be finished - I'd be worried if he were going to have to be digging around the line again!

Before









After

And last but not least... the pool is in the process of filling as I type. The garden hose has been on full-bore for the past 35 hours and we are about two-thirds full. I'm estimating the water bill at around $500 to fill that sucker. It's not a large pool but it is a good 8 feet deep. As we had suspected, the lines were bad - both the skimmer and return lines need to be replaced so we are going to hold that thought until next year... The pool guys will lay lines overground for this season and next fall or next spring we will put permanent lines in when we move the pool equipment off of the platform that's sliding down the hill and over towards the pool house that's falling down. (Another story.)

Friday, March 2, 2007

This cOld House 23

It rained last night. When I was searching for a witty quote about water to open this entry, I couldn't find one that adequately described what was going on. However, I can relate to this one, (at least the first half of it):

I hate water ~W.C. Fields

(Actually the whole quote is, "I hate water - fish f*ck in it." ~W.C. Fields)

Status report. I have been told that the roofers are supposed to come today to dry-us-in. That is, they won't actually fix anything yet - we are still about a month away for that, but I have been advised that the chimney and the valley over the art room will be temporarily stanched. They will also look at the tarp over the window in the girls' bath and see if they can seal it. (Still leaking there.)


This is the leak around the chimney. I didn't bother to go up into the upper attic to show the leak on the backside as well... basically, the chimney, embedded in the corner where the two wings of the house meet, is functioning as a hole in the roof. God knows it doesn't actually function as a chimney.


This is the leak in the art room. We poked a hole in the plaster ceiling because it was so close to the light and we didn't want any build up around the fixture that would lead to short-circuits and death by fire. It has worked pretty well, because not only are we not dead, but the light still works too.


This is the leak in the basement. While it is much much better than it was, and the seepage from the old boiler platform and the crack in the floor has been stopped, it seems that the sump pump has not completely licked the problem. We are still leaking out of the pinholes in the concrete steps down to the lower basement. (We also have the leak coming from the outside wall of the coal bin, but are confident that when the new garage roof is finished, that one will be eliminated.)


Here's a new one. When Rob set the lid last week, he kind of pushed the downspout snake out of the way, which ripped it open. When they knocked off the flying buttress on the corner of the front wall to make room for the new garage wall, they left a hole. These two holes are in very close proximity, allowing the cascade of water off the roof to be directed into the hole in the side of the house. I know there is a Socratic chain here, but I can't put it into words... maybe hole in downspout + hole in house + water in downspout = water in house.


And finally, the sump pump did NOTHING to improve conditions in the laundry room, which flooded much worse last night (thanks to the melt as well as the rain) than it did even in the record breaking downpour we had in January. Korrect Plumbing will come take a look at adding a new drain, or another sump pump at this level. I think our choices will be either a sump pump for $1,500, or trenching the back yard and adding a french drain (like we did around the crawls space,) for $15,000.

Update on the pool: Phil the pool guy stopped by to take a look. He remembered the pool from when the Messicks lived here, (PJ - pre-johngineer) and said the pool is in pretty stable shape. We will have to have it drained and cleaned in the spring, and also have the broken valve replaced and the lines pressure tested to see if there was any damage other than the cracked valve from the freeze. That's kind of good news to us.

Tommie-Cat is getting fat. He used to free-feed at his old home, but there were 7 cats there and from what I understand, he wasn't very high on the totem pole. The vet told me to limit his food and it's been problematic. Because he likes to party all night, I've been locking him into the kitchen. When I got up Wednesday morning I found he had attacked the challah bread that was on the counter and also yarked all over the kitchen. Yesterday he helped himself to a good portion of the ground turkey I had just browned when I went to change Naomi. The vet warned me that a heavy cat is more prone to health problems but I'm to the point now where I feel like I'd rather have a dead happy cat than a live nasty one. Besides, I figure he'll trim down once he gets outside in the spring/summer, like the rest of us. Eat on, Tom!

Wednesday, February 28, 2007

This cOld House 22

This house has some seriously bad water mojo. I'd best be finding me a Feng Shui expert pronto.

Leak of the moment:

The pool equipment has a cracked pipe, which is now draining the filthy, mucky, highly malodorous biology experiment which is the pool water into the area around the pool pump and heater, saturating it. This would be bad enough, if it weren't for the fact that the pump and heater sit precariously perched at the top of this:

This would be the eroding slope that is in the space between the steps from the backyard and the back wall of the old garage. It is actually on our to do list since the equipment is already sliding down the hill down to the level of the driveway, about 10 feet below. As if THAT weren't bad enough, the whole thing is on the other side of this:

This is the foundation crack in the garage. As you can see, it has been 'repaired' using an epoxy that holds the moisture well enough to start mildewing. (Before it lets the stinky water leak all over the garage floor.)

I have a call into my sweethearts, Korrect Plumbing, who are trying to find me someone to get out here today. I'm not sure how the pool pump system works, but the water level is already below the level of the intake, which leads me to believe that the water is coming out of the pool via the main drain... you know, the one at the bottom... meaning if the pool drains all the way, in addition to having a small landslide and a garage that smells like a petri dish full of bacteria, we'll also have a cracked pool. And yes, the pool equipment was winterized... Johngineer did it himself before we moved in. Is there anything he can't do?

Enough of that.

Here's the weatherproofing on the girls' bath window. (Since we are supposed to get that big bad-ass storm blowing through tonight.) We had a leak on the brand new unstained frame last weekend with which we were quite annoyed. Rob was, like, uh - oops.

No sign of the roofers. I do have a call in to their scheduler to get an idea of where we're at. I imagine the bad weather has pushed everything back a bit.

I want you all to know that I am through all the main phases of grief, (you know, mourning the death of Dan's and my savings account.)
Denial - "it's not that bad....
Guilt - "we shouldn't have bought this house...
Anger - "that son-of-a-bitch lied to us...
Acceptance - "I'll call (INSERT CONTRACTOR NAME HERE)...